Fiber Optic & Structured Cabling
Fiber backbone between buildings and floors, delivered with OTDR verification.
Typical duration
3 days – 2 weeks
On-site team
2–4 people
Workmanship warranty
12 months
Handover documents
OTDR results, route plan
What the scope covers
Route planning
Tray routing, protection and termination points decided before any pulling starts.
Pulling and splicing
Fusion splicing with loss measured and recorded per core.
OTDR testing
Every link is tested and the results handed over as part of the documentation.
Termination and labelling
ODP/ODC installed tidily with consistent numbering.
Copper tidy-up
Horizontal and vertical cable management inside the rack.
How we run it
01
Site survey
02
Design & quote
03
Install & testing
04
Handover & support
What you get at the end
01OTDR test results per core
02Cable route plan and termination points
03Consistent numbering on ODP/ODC
04Recorded spare core inventory
What most often goes wrong
Unverified splices only show up months later, when traffic rises. That is why every link is measured and recorded on day one.