WhatsAppCallEmailLocation
WhatsAppCallEmailLocation
← All solutions
02Pulling · Splicing · OTDR

Fiber Optic & Structured Cabling

Fiber backbone between buildings and floors, delivered with OTDR verification.

Typical duration
3 days – 2 weeks
On-site team
2–4 people
Workmanship warranty
12 months
Handover documents
OTDR results, route plan

What the scope covers

Route planning
Tray routing, protection and termination points decided before any pulling starts.
Pulling and splicing
Fusion splicing with loss measured and recorded per core.
OTDR testing
Every link is tested and the results handed over as part of the documentation.
Termination and labelling
ODP/ODC installed tidily with consistent numbering.
Copper tidy-up
Horizontal and vertical cable management inside the rack.

How we run it

01
Site survey
02
Design & quote
03
Install & testing
04
Handover & support

What you get at the end

01OTDR test results per core
02Cable route plan and termination points
03Consistent numbering on ODP/ODC
04Recorded spare core inventory
What most often goes wrong

Unverified splices only show up months later, when traffic rises. That is why every link is measured and recorded on day one.

Often delivered together