Server & Data Centre
Installation, relocation and layout of server rooms so they stay cool, tidy and serviceable.
Typical duration
2 days – 3 weeks
On-site team
3–5 people
Workmanship warranty
12 months
Handover documents
Rack layout, power schedule
What the scope covers
Rack layout
Equipment placed according to airflow and electrical load.
Server relocation
Downtime planning, physical move and post-move service verification.
Virtualisation
Consolidating several physical servers onto virtual hosts.
Power and UPS
UPS capacity calculation and redundant power paths.
Cable management
Labelling and tidying so tracing a cable does not take an afternoon.
How we run it
01
Site survey
02
Design & quote
03
Install & testing
04
Handover & support
What you get at the end
01Equipment placement plan inside the rack
02Power load calculation and UPS sizing
03Labels on every power and data cable
04A rollback plan if the move overruns
What most often goes wrong
Server relocations fail on scheduling far more often than on technique. We agree the downtime window and the abort point before anything powers off.